No. |
PROJECT |
DESCRIPTION |
SCOPE OF
WORK |
CLIENT |
1 |
El-Salam Syphon |
A syphon
crossing under Suez Canal. |
Design of slope
stability, dewatering sys., retaining wall. |
CMC/
BESIX |
2 |
El-Sheikh Zaid
Intake structure and conveying tunnels |
Building an
intake structure and two conveying tunnels
to take water from El-Behairy canal to
El-Sheikh Zaid pumping station |
Full
geotechnical design including the full
design of diaphragm walls and cofferdams |
MC Int. |
3 |
Kom Osheem
Undercrossing |
A water
treatment tunnel undercrossing |
Soil
investigation, Structural design, geotech.
design |
MC int. |
4 |
Ezbet El-Borg
treatment plant |
A water
treatment plant, intake, distribution wells,
administrative units. |
Soil
investigation, Structural design, geotech.
design |
EGYCO |
5 |
Sewer Line No.
9 (Mansora) |
Installation of
new sewer line |
Soil
investigation and recommendation |
EGYCO |
6 |
Abdel-Salam
Aref tunnel, Mansoura |
A traffic
tunnel to undercross railway at Mansoura. |
Geotech.
Investigation, design of the cut and cover
tunnel. |
Nile for roads
and bridges. |
7 |
El-Sheikh Saaud
Bridge, Jedda, Saudia Arabia |
A traffic
bridge of 60 m length to cross a canal. |
Complete design
of foundations, approaches and abutments |
FECO |
8 |
New Quena plant
intake structure |
Sewer line
undercrossing and intake structure. |
Geotech.
Invest., design of the side support system,
dewatering system, effect of jacking on an
exising structure. |
EAC |
9 |
Hew plant
intake structure, Naga Hammadi. |
Sewer line
undercrossing and intake structure. |
Geotech.
invest., design of the side support system,
dewatering system. |
EAC |
10 |
Gerga
Undercrossing, Gerga |
Undercrossing
of an existing canal |
Geotech.
invest., design of the side support system,
dewatering system. |
EAC |
11 |
Kom-Ombo, Kalabsha Undercrossing |
Undercrossing of an exisiting canal |
Geotech. invest., design of the side support
system, dewatering system. |
EAC |
12 |
Inclination
line, Damitta |
Inclination
line in Damitta. |
Geotechnical
Inv and recommendations. |
EGYCO |
13 |
Cairo-Fayoum
highway and Wahat Undercrossing |
Undercrossing
of two main highways |
Full
geotechnical design including the full
design of Soldier pile wall and tunneling. |
MC Int. |
14 |
El-Sheikh Zaid
Pumping Station |
Pumping station
for El-Sheikh Zaid city |
Design of the
station for tendering including the
diaphragm walls |
MC int. |
15 |
Upgrading of
the emergency Canal |
Two
alternatives for the construction and
upgrading of the emergency canal. |
Full design,
analysis, monitoring for tendering stage |
MC int. |
16 |
El-Gabal El-Asfar
Village waste water upgrade |
Performing the
full network of pipes including two
undercrossing with pipes of diameters
ranging between 2" and 2000 mm. |
Full site
supervision and recommendations for shoring
and dewatering. |
Found. Eng. |
17 |
GABCO waste
water system (Dahshour) |
Developing and
enhancing the waste water system and
treatment |
Complete design
and supervision |
GABCO Petroleum
Company |
18 |
Moharam Beck
under-crossing |
Undercrossing
of water way underneath a main road |
Complete design
of the shafts and the tunnels for dewatering
and side support |
Alexandria for
tunnels |
19 |
Suez sweet
water canal under-crossing |
Undercrossing
of the sweet water canal at Suez |
Complete design
of the shafts and the tunnels for dewatering
and side support |
Alexandria for
tunnels |
20 |
New Kena
treatment plant |
A complete
water treatment plant of capacity 600 L/sec(intake,
districution wells, precipitators, filters,
..) |
Geotechnical
design |
TCB |
21 |
Emergency Canal
and the sewer line from Nasr City to
Emergency Canal |
Covering of the
Emergency Canal at Nasr city and the sewer
line to the area |
Geotechnical
investigation, design of different options
including culvert, berlin wall, and drag box
|
MC Int. |
22 |
Madinat Al-Salam
Sewer line |
Construction of
a new sewer line including all the temporary
and permanent works |
Design of the
line and the permanent chambers |
MC int. |
23 |
Luxor
Wastewater treatment plan |
Full new waste
water treatment plant |
Geotech. Inv.,
design of side support system and
dewatering, and the prediction of the
settlement of the railway at tender stage |
Morison Knudsen |
24 |
Alexandria
Wastewater treatment plant extension |
Extension of
Existing wastewater plant |
Geotech. Inv.,
design of side support system and
dewatering, and the prediction of the
settlement of the railway at tender stage. |
Morison Knudsen |
25 |
Kima Railway
Undercrossing |
Undercrossing
of an existing railway by a sewer tunnel |
Geotech. Inv.,
design of side support system and
dewatering, and the prediction of the
settlement of the railway. |
EAC |