Abou-Rawash Pumping station, Intake and Tunnels

Abou-Rawash Pumping station, Intake and Tunnels Contractor’s Consultant and Manager for the Concrete part A 2000 sq m in plan and 12 m deep excavation right at the Nasery Rayah shore. Diaphragm wall with two layers of anchors and dewatering. Two Shafts and two tunnels with Internal diameters of 2.81 m. Intake in the form […]
Sheikh Zayed Intake And Pumbing Station

(حســن محمـــد عـــلام) النصر العامة للمقاولات Sheikh Zayed Intake And Pumbing Station Design, and supervision of the intake structure, pumping station and tunnels at Nasery Canal and tunneling under the behery canal. The length of the cofferdam is more than 100 m of sheetpile and dewatering inside the cofferdam of 4.5 m and inside the […]