Palm Hills, October, Phases 1-3

Palm Hills October, Phases 1-3 Owner’s Consultant A Compound formed of more than 200 Villas for the 3 phases. Acted as geotechnical and structural design consultant for the project and site supervision. Repair of the cracked villas using foundation redesign and construction, piling and grouting. Client: Palm Hills
OWEST

Orascom Developments Owest Project Geotechnical and the geophysical investigation, and foundation recommendations and site supervision A total area of about 1 thousand feddans. Supervision of the construction of the walls, buildings and infrastructure works. Difficult terrain that requires a lot of caution dealing with the neighborhood. Client: Orascom Developments