Grand Hyatt Galleria

Hyundai , Bechtel Grand Hyatt Galleria Local Project Manager and Third Party A 6 storey underground parking lot for the Galleria right at the Nile shore. Geotechnical and Structural consultant and project manager for Hyundai during the construction of the superstructure. Client: Hyundai Project Manager: Bechtel

Gulf of Suez Power Plant, EDF

Hyundai , Bechtel Gulf of Suez Power Plant, EDF Geotechnical Consultant and Pile Testing using NDT The project was supported on deep piles reaching more than 28 m. Piles diameters 1.1 – 1.5 m with capacity reaching 1000 tons. Geotechnical Consultant for the design revision and pile testing. Total Contract Value: 74M EGP Client: Hyundai […]

Four Seasons at the Nile Plaza

Four Seasons at the Nile Plaza Third Party for underground works Contractor (Hyundai) A 5000 sq m in plan with 30 stories above ground and 12 m deep excavation right at the Nile shore. Diaphragm wall with two layers of anchors and dewatering. Piles and barrettes to sustain the building loads Grouting was not needed […]