(حســن محمـــد عـــلام) النصر العامة للمقاولات
Sheikh Zayed Intake And Pumbing Station
- Design, and supervision of the intake structure, pumping station and tunnels at Nasery Canal and tunneling under the behery canal.
- The length of the cofferdam is more than 100 m of sheetpile and dewatering inside the cofferdam of 4.5 m and inside the shafts for more than 10 m.
- Design, monitoring, surveying of marine and onshore structures of the project.

Client: MC Int./Nasr General
Tagged MC Int, Nasr General, projects, Pumbing station, sheikh, zayed