(حســن محمـــد عـــلام) النصر العامة للمقاولات

Sheikh Zayed Intake And Pumbing Station

  • Design, and supervision of the intake structure, pumping station and tunnels at Nasery Canal and tunneling under the behery canal.

  • The length of the cofferdam is more than 100 m of sheetpile and dewatering inside the cofferdam of 4.5 m and inside the shafts for more than 10 m.

  • Design, monitoring, surveying of marine and onshore structures of the project.

Client: MC Int./Nasr General