SAWIRIS

Pyramid Hills Project

Geotechnical Consultant for the Project

  • Diaphragm wall and soil nailing to support Phase I of the project.

  • Design of retaining walls for up to 15 m height.

  • Design of the diaphragm wall and the soil nailing for soil improvement.

  • Revision of the reports prepared by others to deduce the soil properties and the design method.

Client: Pyramid Hills Company