El-Salam Syphon tunnels under Suez Canal

  • ABCG was involved in the design and supervision of the temporary works and soil investigation and monitoring of the tunnels.

  • Works included soil investigations, slope stability design, grouting, retaining wall design and tunneling monitoring and settlement prediction.

  • Works included 4 tunnels with diameter 6.5 m each.

Clients: CMC/Besix