Grand Hyatt Galleria

Hyundai , Bechtel Grand Hyatt Galleria Local Project Manager and Third Party A 6 storey underground parking lot for the Galleria right at the Nile shore. Geotechnical and Structural consultant and project manager for Hyundai during the construction of the superstructure. Client: Hyundai Project Manager: Bechtel

Gulf of Suez Power Plant, EDF

Hyundai , Bechtel Gulf of Suez Power Plant, EDF Geotechnical Consultant and Pile Testing using NDT The project was supported on deep piles reaching more than 28 m. Piles diameters 1.1 – 1.5 m with capacity reaching 1000 tons. Geotechnical Consultant for the design revision and pile testing. Total Contract Value: 74M EGP Client: Hyundai […]

Ramlet Boulak Tower by the Nile

Ramlet Boulak Tower by the Nile Geotechnical Consultant for the Owner for all the underground works A Towers on the Nile with 16 stories in Ramlet Boulak.with two levels underground parking. Grouting and Dewatering works and Piles to sustain the towers and piles for side support. Piles diameter 1.1 m Client: Samcrete

Kuwait Embassy Tower by the Nile

Kuwait Embassy Tower by the Nile Geotechnical Consultant for the Contractor for all the underground works A Towers on the Nile with 16 stories in Giza. With two levels underground parking. 3500 sq m in plan. Dewatering works and Piles up to 1.2 m diameter to sustain the towers and piles for side support. Client: […]

Four Seasons at the Nile Plaza

Four Seasons at the Nile Plaza Third Party for underground works Contractor (Hyundai) A 5000 sq m in plan with 30 stories above ground and 12 m deep excavation right at the Nile shore. Diaphragm wall with two layers of anchors and dewatering. Piles and barrettes to sustain the building loads Grouting was not needed […]

SECON Nile Towers

Arabtec-Siac JV SECON Nile Towers Geotechnical Consultant for the Contractor for all the underground works 2 Towers, 22 stories high on the Nile in Maadi with three underground parking. 10000 sq m in plan. Piles to sustain the towers and diaphragm wall for side support. Client: Arabtec-Siac JV

North Edge Alamein Towers

NUCA North Edge Alamein Towers Geotechnical Consultant for the Owner for all the underground works 12 Towers, maximum 44 stories high on the North Coast in Alamein with piles up to depth of 65 m. Soil improvement in the podium area. Client: NUCA

500-500 National Cancer Institute, Sheikh Zayed

National Cancer Institute 500-500, Sheikh Zayed Geotechnical Consultant for underground works A 22 above ground stories and 4 underground stories on a total area of more than 100000 sq m in plan. Diaphragm wall with multiple layers of nails Piles and raft to sustain the building loads Client: National Cancer Institute

Damiatta Furniture City

DFC/K&A Damiatta Furniture City Geotechnical Consultant for the Project Several piles for the hangers with depths reaching 35 m. Design of the piles, dewatering and soil improvement. Revision of the reports prepared by others to deduce the soil properties and the design method. Pile load tests analyses and review. Client: DFC/K&A

PYRAMID HILLS PROJECT

SAWIRIS Pyramid Hills Project Geotechnical Consultant for the Project Diaphragm wall and soil nailing to support Phase I of the project. Design of retaining walls for up to 15 m height. Design of the diaphragm wall and the soil nailing for soil improvement. Revision of the reports prepared by others to deduce the soil properties […]