Abou-Rawash Pumping station, Intake and Tunnels

Contractor’s Consultant and Manager for the Concrete part

  • A 2000 sq m in plan and 12 m deep excavation right at the Nasery Rayah shore.

  • Diaphragm wall with two layers of anchors and dewatering.

  • Two Shafts and two tunnels with Internal diameters of 2.81 m.

  • Intake in the form of Sheet piles right inside the Behairy canal

  • Total Contract value:45M EGP

Clients: Mokhtar Ibrahim, MC International