ERA Head office and Admin building

ERA ERA Head office and Admin building Complete Design, project management and site supervision The design included all aspects architectural, structural and electromechanical. The building is constructed on 2500 square meters infront of Shooting Club, Dokki. The supervision is for all activities. Remaining works include 20% of Electromechanical and all finishes. Client: ERA

Salah El-Din Admin center, Mostafa Mahmoud Square

Mostafa Mahmoud Square Salah El-Din Admin center Complete Design, project management and site supervision The design included all aspects architectural, structural and electromechanical, with central HVAC system. The building is constructed on 2000 square meters in the heart of Mohandesin. The supervision is for all activities. Remaining works include 50% of Electromechanical and all interior […]

Steigenberger NSGB building, Tahrir

Steigenberger NSGB building, Tahrir Owner’s Consultant A 5500 sq m in plan and 10.5 m deep excavation in the city center at the water front with water level at 2.5 m from ground level. • Diaphragm wall with one layer of anchors and dewatering with some precautions for the neighboring bridge. Project Cost EGP 45.0 […]

Grand Hyatt Galleria

Hyundai , Bechtel Grand Hyatt Galleria Local Project Manager and Third Party A 6 storey underground parking lot for the Galleria right at the Nile shore. Geotechnical and Structural consultant and project manager for Hyundai during the construction of the superstructure. Client: Hyundai Project Manager: Bechtel

Gulf of Suez Power Plant, EDF

Hyundai , Bechtel Gulf of Suez Power Plant, EDF Geotechnical Consultant and Pile Testing using NDT The project was supported on deep piles reaching more than 28 m. Piles diameters 1.1 – 1.5 m with capacity reaching 1000 tons. Geotechnical Consultant for the design revision and pile testing. Total Contract Value: 74M EGP Client: Hyundai […]